Sanchez Santana, Jenny Estefania
WEP6137
Quality Assurance for CERN accelerator beam-transfer HL-LHC and Consolidation deliverables
To assure all deliverables for the Long Shutdown 3 (LS3) will be met, the Accelerator Beam Transfer (ABT) group has launched a coordinated initiative to strengthen Quality Management (QM), Project Management (PM), and Enterprise Asset Management (EAM). A harmonized QM framework and enhanced Non-Conformity Report (NCR) process enable early anomaly detection and structured follow-up across design, manufacturing, installation, commissioning, and operation. The upgraded PM methods clarify project scope and responsibilities, enhance risk and milestone tracking, and support coordination across HL-LHC Project and Consolidation deliverables. In parallel, the unified EAM strategy enhances equipment traceability through standardized asset structures, linked documentation and NCRs, and it provides a comprehensive lifecycle overview. Additionally, logistics have been strengthened via a dedicated service supporting the group. Together, these measures establish a robust framework for planning, executing, and documenting ABT projects for LS3, but also future shutdowns, as well as interventions in the accelerators during operation.
  • D. Jones, C. Lolliot, C. Schmitt, F. Velotti, F. Lackner, J. Borburgh, J. Sanchez Santana, K. Papastergiou, M. Novicic, P. Trubacova, T. Kramer
    European Organization for Nuclear Research
Cite: reference for this paper using: BibTeX, LaTeX, Text/Word, RIS, EndNote