Gang Xu (Institute of High Energy Physics, Chinese Academy of Sciences, Institute of High Energy Physics)
TUP2602
Progress of physics studies and beam commissioning of the High Energy Photon Source
1367
The High Energy Photon Source (HEPS) is a 35-pm, 1360-m storage ring light source being built in the suburb of Beijing, China. The HEPS construction started in 2019, with the main civil construction finished at the end of 2021. In the past two years, the beam commissioning of the HEPS storage ring had been started and bascially finished. In this paper, we will briefly introduce commissioning of the HEPS storage ring, and relavent physics studies.
  • C. Meng, F. Zeng, W. Pan, X. Li, X. Huang, Y. Jiao, Y. Peng
    Chinese Academy of Sciences
  • C. Yu, D. Ji, D. Li, F. Zhao, F. Yan, G. Xu, H. Xu, H. Ji, H. Zheng, H. Qu, J. Li, J. Cao, J. Zhang, J. Li, J. Wang, L. Qin, N. Li, P. He, S. Chen, S. Lin, W. Bao, W. Kang, X. Lu, X. Cui, Y. Wu, Y. Zhao, Y. Lu, Y. Li, Y. Huang, Y. Guo, Y. Wei, Y. Yang, Y. Liu, Z. Duan, Z. Li, Z. Zhao, Z. Wang
    Institute of High Energy Physics
  • M. Su, N. Wang
    University of Chinese Academy of Sciences
  • Y. Dong
    Institute of High Energy Physics, Chinese Academy of Sciences
Paper: TUP2602
DOI: reference for this paper: 10.18429/JACoW-IPAC2026-TUP2602
About:  Received: 11 May 2026 — Revised: 18 May 2026 — Accepted: 20 May 2026 — Issue date: 22 May 2026
Cite: reference for this paper using: BibTeX, LaTeX, Text/Word, RIS, EndNote
TUP2703
Commissioning status of booster-based beam-recycling swap-out injection at HEPS
1528
The High Energy Photon Source (HEPS) adopts on-axis swap-out injection to relax the dynamic-aperture requirement of its ultralow-emittance storage ring. To provide high-charge bunches for swap-out operation, a booster-based beam-recycling scheme has been developed, in which a depleted storage-ring bunch is extracted, transported to the booster, combined with a newly accelerated bunch at high energy, damped, and reinjected into the original storagering bucket. This paper summarizes the commissioning status of this scheme. Closed-loop beam recycling has been demonstrated, paving the way for user operation toward high bunch charge. The results validate the basic beam-recycling architecture and identify the main directions for further optimization toward routine high-charge operation.
  • Z. Duan, D. Ji, F. Liu, G. Wang, H. Xu, J. Li, J. Chen, J. He, S. Tian, X. Lu, Y. Du, Y. Zhao, Z. Liu
    Institute of High Energy Physics
  • C. Meng, P. Liu, X. Huang, Y. Jiao, Y. Peng
    Chinese Academy of Sciences
  • G. Xu, Y. Lu
    Institute of High Energy Physics, Chinese Academy of Sciences
Paper: TUP2703
DOI: reference for this paper: 10.18429/JACoW-IPAC2026-TUP2703
About:  Received: 12 May 2026 — Revised: 18 May 2026 — Accepted: 21 May 2026 — Issue date: 22 May 2026
Cite: reference for this paper using: BibTeX, LaTeX, Text/Word, RIS, EndNote